I think any broken lines are to be spliced in an electrical box. A metal box seems preferable to plastic. The rest is patching the surface material, usually drywall and/or plaster that was originally there.
http://www.heatpro.info heat/cool right-sizing
The Senate and House can not find a suitable health plan for the nation; they should open their own exclusive health plan booklet and start reading.