• This topic is empty.
Viewing 1 reply thread
  • Author
    Posts
    • #42405
      Rich
      Guest

      Just a quick question. when installing drip-edges on the roof, what goes down first, the drip edge or the 30lb. felt paper. In other words, what is on top of what? Thanks in advance, Rich

    • #224750
      killian russell
      Guest

      at the eaves drip then paper at the rakes paper then drip ,,at the eaves you really need a ice and water barrier

Viewing 1 reply thread
  • You must be logged in to reply to this topic.